Model Number: TOP-009-J21
Brand Name: TOPWELL
Key Specifications/Special Features:
Product name: plastic injection moldingMold shaping: plastic injection moldPlasticmaterial: according toyour requirementColor: according toyour requirementApplicable to: company, marketingMoldlifespan: 500,000 shots
Certificate:ISO 9001, ISO14001, TS16949, ISO13485
Summary:
- Before mold building: our teams will evaluate your part design to give you the DFM report, such us cooling, venting, gating, cavity/core sticking, short shot, shrinkage, thin steel conditions and more,Also our engineers will assist in improving the part design and optimizing the mold design to save your cost
- During mold building: we build the DME and Hasco standard mold as customers require, and we will provide you the steel certificate and heat treatment certificate; we will send you the progress report with digital photos every week to keep you updated; the most important is that we will give you the good T1 samples on time
- Mold approval: we will modify the mold until getting your approval on the samples, and we will invite you to attend the mold trial or send you mold test video
- RD&MD design
- Prototyping
- Plastic injection mold
- Double shot plastic
- Over mold
- IML/IMD
- Rubber injection molding
- AL/zinc die casting mold
- Metal stamping dies(punching tool, trimming dies)
- Thermoforming
- Mold flow analysis
- Plastic/metal product producing
- Assembly
- Silk screening
- Anodize treatment
- Laser etching
- Painting
- E-plating
- Ultrasonic welding
- Material selection
- SMT assembly line
- For mold: first, assemble and clear mold; second, the mold coated fog or grease and PE fresh-keeping film wrapped; third, put the mold and the mold files (such as injection machine date, steel material certification and more) into stable wooden carton; final, seal the carton with nails
- For products: first, wrapped each part up with semi-transparent thin foam and put it into plastic bag; second, put them into cartons with thin sponge plates to prevent scratches
- We have an excellent team of specialists and undergraduates and advanced engineers, R&D department has 3 ID, 6 MD, and 50 engineers, the department of mold manufacturing, 120 professional mold makers
Shipping Information:
- FOB Port: Shenzhen
- Lead Time: 7 - 20 days
Main Export Markets:
- Australasia
- Eastern Europe
- Mid East/Africa
- North America
- Western Europe